With 5 floors and 22 metres high, it is the first office building in Spain to be built entirely of wood. The construction of this building is committed to the industrialisation of the construction elements. That is why wood appears as the optimum material to form the structure. A system of GLT beams and posts on which the CLT panels rest to form the floor slabs was chosen, which adapts to the large spans required in a multifunctional building such as this one.

23. Wittywood office building