Para além deste Comité Director, serão realizadas reuniões do grupo de trabalho no dia 1 de Dezembro e visitas de estudo a edifícios de madeira de arranha-céus na área terão lugar no dia seguinte.

Os parceiros do Projecto Interreg Sudoe Eguralt deslocar-se-ão a Soria no dia 1 de Dezembro para realizar o quinto Comité de Pilotagem do Projecto. Além disso, a parceria aproveitará esta viagem para realizar as reuniões técnicas de cada um dos grupos de trabalho, bem como uma série de visitas de estudo no segundo dia da reunião.

Assim, a ordem do dia é a seguinte:

ORDEM DO DIA

1st of December from 9h30 to 11h30:

  1. Welcome – Nasuvinsa & Cesefor
  2. Cross–cutting task groups. The closure of semesters 4 – Proyecta & GAP Recursos

2.1. Presentation of the updated KPIs for GT.T1 – PROYECTA

2.2. Presentation of the updated KPIs for GT.T2 – PROYECTA

2.3. Presentation of the updated KPIs for GT.T3 – PROYECTA

2.4. Semester 4: quality control results – GAP Recursos

  1. Presentation and validation of the work plan for semester 5

3.1. Gantt chart for Semester 5 – PROYECTA

3.2. Quality Control and Risks Gantt chart for Semester 5 – GAP RECURSOS

  1. Communication strategy: a review of the activities carried out up to date and planned activities for semester 5 – PROYECTA
  2. Second-to-last certification of expenditure – PROYECTA
  3. Other questions and comments – ALL PARTNERS

5th GT1 Technical Working Group Meeting

Time: 11:30 – 12:30

  1. Status of the activities and deliverables of GT1 “Diagnosis, exchange of knowledge and study of opportunities”

1.1. A1.3 – Timber construction perception survey in the Sudoe area – ENSAPBx

1.2. A1.5 – Development of a guide to timber construction in the Sudoe for the dissemination of results. Presentation of the book – Identification and Analysis: contents and My Maps – CESEFOR

  1. Semester 4: Presentation of the updated KPIs for GT1 & Outputs – PROYECTA
  2. Questions and comments

5th GT2 Technical Working Group Meeting

Time: 13:30 – 15:30

  1. Status of the activities of GT2 “Experimentation of new processes, products and technologies for the optimisation of the use of wood in construction”

1.1. A 2.1 – Experimentation in public housing development – NASUVINSA, BASKEGUR

1.2. A 2.2 – Experimentation in pre-industrialisation processes

1.2.1. Experiment 1 – CESEFOR, SERQ

1.2.2. Experiment 2 – ADEMAN

1.3. A 2.3 – Experimentation in new products and technologies aimed at optimising the use of wood in the construction of mid-rise buildings

1.3.1. Pilot 1 – CESEFOR, SERQ, ADEMAN

1.3.2. Pilot 2 – ENSAPBx, XYLOFUTUR

1.3.3. Pilot 3 – XERA

  1. Semester 4: Presentation of the updated KPIs for GT2 & Outputs – PROYECTA
  2. Questions and comments

4th GT3 Technical Working Group Meeting

Time: 15:30 – 17:30

  1. Planning GT3 “Dissemination, knowledge capitalisation and awareness raising for a paradigm shift towards sustainable construction using timber”

1.1. A3.1 – Development of demonstration videos and organisation of workshops for dissemination and transfer of gt2 products – ADEMAN, XERA

1.2. A3.2 – Development of a training module on mid-rise timber construction to introduce the knowledge in architecture colleges, secondary and tertiary Education – ENSAP, SERQ

1.3. A3.3 – Collaborations and alliances with international networks on mid-rise timber construction – XYLOFUTURE

1.4. A3.4 – Campaign to raise awareness among the general public and public authorities about the benefits of wood as an ecological and sustainable building material – XERA

  1. Semester 4: Presentation of the updated KPIs for GT3 & Outputs – PROYECTA
  2. Questions and comments

Study Visits

    • Cesefor Lab (1st December from 17:30 to 18:30)
    • Lósan (2nd December from 9 to 12)
    • La casa de la madera de Revenga (2nd December from 15 to 17:30)